Question: 1.) A carousel transfer line has 15 stations. The ideal cycle time Tc is 3.4 s/cycle. The breakdown rate of the whole line F is
1.) A carousel transfer line has 15 stations. The ideal cycle time Tc is 3.4 s/cycle. The breakdown rate of the whole line F is 0.006 stops/cycle. Average down time Td is 432 s/stop.
Calculate the average production rate Rp to the nearest 1 part/hr.
2.) A carousel transfer line has 15 stations. The average production time Tp is 4 s/cycle. The material cost Cm is 3 $/part. The machine costs $86/hr to operate. The average tooling cost Ct is $0.9/part.
Calculate the cost per part Cpc to the nearest $0.01/part.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock