Question: 1. Develop a network diagram for the project. Identify the critical path and the overall project duration in weeks. 2. Based on the identified critical

1. Develop a network diagram for the project.

1. Develop a network diagram for the project.

1. Develop a network diagram for the project. Identify the critical path and the overall project duration in weeks.

2. Based on the identified critical path, Client has asked to reduce the schedule by 6 weeks. How can we achieve this without reducing the activity durations.

Note: Ignore activity 1.1 for this network diagram creation.

10 City Sports Complex 11 Design, Project Management & Control 1.2 Site Preparation 33 Ovil Warks 14 Building 15 Building Equipment 16 Finishing 1.7 Inspection & Handover 121 Hazardous 1 Focation 1.4.1 External Slnudure 1.5.1 Heating & Ventilation Equipment 16.1 lee Hockey 1.7.1 Final Inspection & Testing 1.6 2 Multi-Purpose 1.22 Garbage / Other Waste Removal 13.2 Foundation 1.2 Roof 1.5.2 Refrigeration Equipment 1.712 Handover & Training 15 Elsenal 1.2.3 City Utility Connections 1.1.3 Interior Secure 1.6.3 Running Track 15 Water and Plumbing Equipment 1.6.4 Changerooms and hans 1s Fine Water Equipment 1.6.5 Daycare Centre WBS Definition Expected Duration 1.2.1 Hazardous Waste Remove hazardous waste (cg oil, batteries) 3 weeks from site 1.2.2 Garbage /Other Remove all garbage and other waste from 1 weck Waste Removal site 1.23 City Utility Buy and install infrastructure to connect to I weck Connections city power, water, firewater, sewerage 1.3.1 Excavation Excavate soil required for foundation, 2 weeks 1.3.2 Foundation Construct foundation for building. 6 weeks 1.4.1 External Structure Build external structure - walls, doors, 8 weeks windows etc 1.4.2 Roof Install roof on top of external structure 3 weeks 1.4.3 Interior Structure Build interior structure - walls, doors, 10 weeks electrical, plumbing, piping, ducting, etc 1.5.1 Heating and Buy and install heating and ventilation 3 weeks Ventilation Equipment equipment 1.5.2 Refrigeration Buy and install refrigeration equipment for 2 weeks Equipment lce rink 1.5.3 Electrical Switchboard | Buy and install main electrical switchboard 1 week 1.5.4 Water and Plumbing Buy and install hot water tanks, pumps, 3 weeks Equipment main drains etc 1.5.5 Fire Water Equipment Buy and install firewater pumps, controls 1.6.1 Ice Hockey Arena Buy and install all equipment, signage, as well as painting etc to finish ice hockey 4 wecks 1.6.2 Multi-Purpose Gym 3 weeks 16.3 Running Track 2 weeks 16,4 Changerooms and Washrooms 4 weeks Buy and install all flooring equipment, signage, painting etc to finish multi- BOSE sym Buy and install all flooring, equipment, signage, painting etc to finish running track. Buy and install all flooring tiling, equipment, signage, painting etc to finish changerooms and washrooms Buy and install all flooring, equipment, Signute painuine ele to linsh davoare Une Inspection and Testing of all parts of new LAN Handover of new facillin to opeuutine suull as well as un LNGNSS 2 weeks weeks 1.7.1 Final Inspection & Testing 1.712 Handover and Trening wouls

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!