Question: 1) Given the project within the table below ( 3 points), a. Draw the network diagram. Calculate the: b. The critical path c. The minimum
1) Given the project within the table below ( 3 points), a. Draw the network diagram. Calculate the: b. The critical path c. The minimum project duration d. The amount of slack for each activity
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts