Question: 1. Leveling outside slack _________ results in increased project duration. a) Always b) Never c) Sometimes 2. Even with a positive value of schedule variance

1. Leveling outside slack _________ results in increased project duration.

a) Always

b) Never

c) Sometimes

2. Even with a positive value of schedule variance index (SV), a project could be behind or delayed in terms of completion date. Discuss how that could be possible. Please provide a detailed scenario based answer.