Question: 1 Port loading and unloading problem Design of a logistics decision making system There are 20 ships in the harbor, of different sizes and characteristics

1 Port loading and unloading problem Design of a

1 Port loading and unloading problem Design of a logistics decision making system There are 20 ships in the harbor, of different sizes and characteristics waiting to unload/load at one specialized wharf. Each ship has the duration for unload/load proportional with the capacity: Changing from one ship to another requires a setup time proportional with the difference in size between the two ships (setting the equipment): - Duration to maneuver a ship is proportional with its size: - The revenue from operating the port and the wharf is proportional with the speedy processing of each vessel: - Penalties are paid for keeping Itdw on hold per hour; Determine the order for unloading/loading the vessels to maximize profit; capacity (tdw) 16500 26100 26100 8100 1500 23400 16500 24600 19800 9900 21600 17700 19200 22200 26100 13200 16200 10200 25500 14400 setup Ih per every 20000 t difference between ships maneuvering 30 min per every 10000 t - additive for the weight of the two ships unloading/loading capacity of the wharf: 1500 h penalties MU 0.1 per ton of ship kept to wait nett revenue for operating the wharf MU 5/ton processed Develop a heuristic for each of the following policies: - First come first served heuristic: - Serve in order from the largest ship to the smallest; - Minimise setup costs select sequence to reduce the amount of changes from one ship to another; - Minimize idle time - get the ship that can dock fastest after the current ship leaves the wharf: Apply each heuristic (3 runs minimum). Compare, contrast, select and comment on the best heuristic. Generalize your findings 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 Port loading and unloading problem Design of a logistics decision making system There are 20 ships in the harbor, of different sizes and characteristics waiting to unload/load at one specialized wharf. Each ship has the duration for unload/load proportional with the capacity: Changing from one ship to another requires a setup time proportional with the difference in size between the two ships (setting the equipment): - Duration to maneuver a ship is proportional with its size: - The revenue from operating the port and the wharf is proportional with the speedy processing of each vessel: - Penalties are paid for keeping Itdw on hold per hour; Determine the order for unloading/loading the vessels to maximize profit; capacity (tdw) 16500 26100 26100 8100 1500 23400 16500 24600 19800 9900 21600 17700 19200 22200 26100 13200 16200 10200 25500 14400 setup Ih per every 20000 t difference between ships maneuvering 30 min per every 10000 t - additive for the weight of the two ships unloading/loading capacity of the wharf: 1500 h penalties MU 0.1 per ton of ship kept to wait nett revenue for operating the wharf MU 5/ton processed Develop a heuristic for each of the following policies: - First come first served heuristic: - Serve in order from the largest ship to the smallest; - Minimise setup costs select sequence to reduce the amount of changes from one ship to another; - Minimize idle time - get the ship that can dock fastest after the current ship leaves the wharf: Apply each heuristic (3 runs minimum). Compare, contrast, select and comment on the best heuristic. Generalize your findings 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!