Question: 1. Two processes, p1 and p2 arrive at time 0 and start executing using RR scheduling. The total CPU time of p1 is 70 time

1. Two processes, p1 and p2 arrive at time 0 and start executing using RR scheduling. The total CPU time of p1 is 70 time units, and p2 is 10. The quantum is Q = 10. The context switching time, which follows every Q, is S = 1.

2. Three periodic processes with the following characteristics are to be scheduled: T is the CPU Time and D is the period of the process.

1. Two processes, p1 and p2 arrive at time 0 and start

For each case, determine if a feasible schedule is likely to be generated by:

  • RM
  • EDF

Draw the Gantt chart for the first 25-time units. For each of the 3 cases, show the schedules produced by RM and by EDF.

Case 1 T D Case 2 T D Case 3 T D p1 3 50 p1 15 50 p1 5 20 p2 70 1000 p2 5 10 p2 7 10 p3 5 40 p3 1 p3 4 100

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!