Two processes, p1 and p2 arrive at time 0 and start executing using RR scheduling. The total CPU time of p1 is 50 time units, and p2 is 20. The quantum is Q = 10. The context switching time, which follows every Q, is S = 1. The turnaround time of p1 is Ex: 129 The turnaround time of p2 is The average turnaround time, ATT, is