Question: Two processes, p1 and p2 arrive at time 0 and start executing using RR scheduling. The total CPU time of p1 is 50 time units,
Two processes, p1 and p2 arrive at time 0 and start executing using RR scheduling. The total CPU time of p1 is 50 time units, and p2 is 20. The quantum is Q = 10. The context switching time, which follows every Q, is S = 1.
The turnaround time of p1 is:
The turnaround time of p2 is:
The average turnaround time, ATT, is:
Step by Step Solution
There are 3 Steps involved in it