Question: 1. Use the minimum total slack (Min TS) heuristic to schedule the resource-constrained project. If a tie occurs, use minimum activity duration to break the
1. Use the minimum total slack (Min TS) heuristic to schedule the resource-constrained project. If a tie occurs, use minimum activity duration to break the tie.
Units of resource type 1 available = 10
Units of resource type 2 available = 15
2. Suppose the utilization level of a critical resource is defined by a normal distribution with a mean of 70% and a variance of 24% squared. Compute the probability that the utilization of the resource will exceed 85%.