Question: 1.) Using the data from the picture, construct a process control chart with 2-sigma control limits, and determine the status of the process. 2.) Discuss
1.) Using the data from the picture, construct a process control chart with 2-sigma control limits, and determine the status of the process.
2.) Discuss how the method used in (1) can be used to improve the overall service quality