Question: 15 An activity on a PERT network has these time estimates: optimistic = 2, most likely = 3, and pessimistic = 4. Its expected time

15 An activity on a PERT network has these time
15 An activity on a PERT network has these time estimates: optimistic = 2, most likely = 3, and pessimistic = 4. Its expected time is (1 Point)