Question: 2 . 5 A certain part is routed through six machines in a batch production plant. The setup and operation times for each machine are

2.5 A certain part is routed through six machines in a batch production plant. The setup and
operation times for each machine are given in the table below. The batch size is 100 and the
average nonoperation time per machine is 12 hours. Determine: (a) manufacturing lead time and
(b) production rate for operation 3.
2.6 Suppose the part in previous Problem 2.5 is made in very large quantities on a production
line in which an automated work handling system is used to transfer parts between
machines. Transfer time between stations =15s. The total time required to set up the
entire line is 150 hours. Assume that the operation times at the individual machines
remain the same. Determine: (a) manufacturing lead time for a part coming off the line,
(b) production rate for operation 3,(c) theoretical production rate for the entire
production line?
2.72.7. The average part produced in a certain batch manufacturing plant must be processed
through an average six machines. Twenty (20) new batches of parts are launched each
week. Average operation time =6min., average setup time =5 hours, average batch size =
25 parts, and average nonoperation time per batch =10hrmane. There are 18
machines in the plant. The plant operates an average of 70 production hours per week.
Scrap rate is negligible. Determine: (a) manufacturing lead time for an average part, (b)
plant capacity, (c) plant utilization. (d) How would you expect the nonoperation time to be
affected by the plant utilization?
2.8 Based on the data in previous Problem 2.7 and your answers to that problem, determine
the average level of work-in-process (number of parts-in-process) in the plant.
 2.5 A certain part is routed through six machines in a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!