Question: A certain part is routed through six machines in a batch production plant. The setup and operation times for each machine are given in the

A certain part is routed through six machines in a batch production plant. The setup and operation times for each machine are given in the table below. The batch size is 100 and the average non-operation time per machine is 12 hours. Determine (a) manufacturing lead time and (b) production rate for operation 3.
Suppose the part is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines. Transfer time between stations =15 s. The total time required to set up the entire line is 150 hours. Assume that the operation times at the individual machines remain the same.
Determine (a) manufacturing lead time for a part coming off the line, (b) production rate for operation 3,(c) theoretical production rate for the entire production line?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!