Question: 2. Using CPM method, find the expected project duration and the critical path Activity Description Required Predecessor Duration A Product design (None) 5 B Market

2. Using CPM method, find the expected project

2. Using CPM method, find the expected project duration and the critical path Activity Description Required Predecessor Duration A Product design (None) 5 B Market research (None) 1 Production analysis A 2 D Product model A 3 Sales brochure A 2 F Cost analysis 3 G Product testing D 4 H Sales training BE 2 I Pricing H 1 J Project report F, G, I 1 || Ult