For each level of output, calculate the variable cost ( VC ). For each level of output
Fantastic news! We've Found the answer you've been seeking!
Question:
For each level of output, calculate the variable cost (VC). For each level of output except zero output, calculate the average variable cost (AVC), average total cost (ATC), and average fixed cost (AFC).
Qty of boats | Total Cost | Variable Costs a. | Average Variable Costs b. | Average Total Costs c. | Average Fixed Cost d. |
0 | $450,000 | - | - | - | - |
1 | 490,000 | ||||
2 | 510,000 | ||||
3 | 520,000 | ||||
4 | 540,000 | ||||
5 | 570,000 | ||||
6 | 610,000 | ||||
7 | 670,000 | ||||
8 | 750,000 | ||||
9 | 870,000 |
What is the minimum-cost output?
Related Book For
Posted Date: