Question: (3) A project was planned using PERT. Its expected completion time was determined to be 55 days. The variance of the critical path is 36.

(3) A project was planned using PERT. Its expected completion time was determined to be 55 days. The variance of the critical path is 36. What is the probability the project will be completed in 59 days or more (5 decimal places)? Let X= the project completion time. P(X Please show how you use the Normal Curve Table to obtain your answer in the space below. (4) Perform a project management analysis for the data given below to determine ES, EF, LS, LF, and slack for each activity, the total project completion time, and the critical path. Activity Time (weeks) Predecessors A B C D 9 8 D E F G H 6 5 - A A Activity E F G H Time (weeks) Predecessors B B C, E D, F (a) Draw a network with t, ES, EF, LS, and LF (follow the same format as Figure 11.5 on p.394). (b) Complete the following table (similar in format to Table 11.3 on p.396). ES EF LS Activity Time (weeks) A B C (c) Identify the critical path(s): (d) Based on your analysis, the project completion time is: 7 9 13 10 LF Slack Critical? weeks and the least critical activity is:
 (3) A project was planned using PERT. Its expected completion time

(3) A project was planned using PERT. Its oxpected completion time was determined to be 55 days. The variance of the critical path is 36 . What is the probability the project will be completed in 59 days or more ( 5 decimal places)? Let X= the project completion time. P(X (4) Perform a project management analysis for the data given below to determine ES, EF, LS, LF, and slack for each artisin the total nmiest enmnletion time. and the critical purth. (a) Draw a network with x,ES,EF,LS, and LF (follow the same former as Figure II.5 on p.394). (h) Comnlete the following table (similar in format to Table I/.3 co p.396). (c) Identify the critical path(s): (d) Based on your analysis, the project completion time is: weeks and the least critical activity is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!