Question: 3.1 The work breakdown structure for building a house (levels ! and 2) is shown below: ) Add two level-3 activities to cach of the

3.1 The work breakdown structure for building a house (levels ! and 2) is shown below: ") Add two level-3 activities to cach of the level 2 activities to pro visde mure detail to the WES by Select one of your level-3 activities and add two level 1 activi ties below it