Question: #4 In order to prepare a Materials Requirements Plan which of the following inputs are required? Information on factory work conditions such as optimum batch

#4 In order to prepare a Materials Requirements Plan which of the following inputs are required?

  1. Information on factory work conditions such as optimum batch sizes
  2. Information about current stock levels and material orders
  3. The structure of the items being manufactured (what it is made of)
  4. Supplier (raw material) and factory (manufacturing) lead times
  5. All of the above