Question: 6 ) Schedule the following activities using CPM:Activity Immediate Predecessor Time ( Weeks ) A - 1 B A 4 C A 3 D B

6) Schedule the following activities using CPM:Activity Immediate Predecessor Time (Weeks)A -1B A 4C A 3D B 2E C, D 5F D 2G F 2H E, G 3a) Draw the network (5 points)b) What is the critical path? (5 points)c) How many weeks will it take to complete the project? (5 points)d) Which activities have slack, and how much? (5 points)7) NORAN Inc. is a fabrication and assembly shop that produces radios, each of which consistsof two identical electronic receiver boards and an aluminum chassis. These components are puttogether in radio assembly. The electronic boards are obtained from a supplier who has a one-week delivery lead-time. The aluminum chassis is fabricated internally and the fabrication lead-time is one week. The lead-time for assembling the radio is also one week. Only one shipment ofcompleted radios is made in a week, at the beginning of the week.Radio Assembly Lead Time: 1 week Electronic BoardsLead Time: 1 week Used: 2 per radio ChassisLead Time: 1 week Used: 1 per radio
It is the beginning of week 1. NORAN is planning fabrication and purchasing based on themaster schedule shown below. (The only relevant weeks are those numbered 4,5,6 and 7.) Themaster schedule requires 50 radios to be shipped at the beginning of week 4, another 50 to beshipped at the beginning of week 5, and so forth. There are currently 10 electronic boards, and nochassis units or assembled radios, in inventory.a) Using MRP logic, determine the schedule of planned order releases for radio assembly,electronic board purchase, and chassis fabrication that is required to meet the radio shippingmaster schedule. (20 points)Radio Shipping Master ScheduleWeek 1234567Radio Shipment 000505010080Radio Assembly RequirementsWeek 1234567RequirementsInitial InventoryScheduled ReceiptsPlanned Order ReleaseElectronic Board RequirementsWeek 1234567RequirementsInitial InventoryScheduled ReceiptsPlanned Order Release

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!