Question: 7. Consider the network presented in the following table. a. Draw the network diagram b. Identify the critical path c. Identify the slack available at

7. Consider the network presented in the following table. a. Draw the network diagram b. Identify the critical path c. Identify the slack available at any non-critical points d. Calculate the minimum project duration