Question: 7) Project Gantt (Bar Chart) Schedule: Using the information supplied in the Dream House Task Table, create a management-level Gantt chart showing the project schedule.
7) Project Gantt (Bar Chart) Schedule: Using the information supplied in the Dream House Task Table, create a management-level Gantt chart showing the project schedule.
8) Critical Path (Network) Diagram (PMBOK Section 6.5.2.2.): Prepare a full network diagram (using the critical path method that includes both the forward and backward pass information) for the project. You do not need to use any professional scheduling software like MS Project; any drawing package using msWord, Excel or PowerPoint, should be sufficient. Even a simple digital image (taken by your phone) of a hand-drawn network diagram will be acceptable (actually, this could be the most efficient way to prepare your network diagram).
WBS Item Activity Name DEP (Activity DURATION Dependencies) days) 100 2 101 8 Foundation & Landscape 101 Excavate foundation 102 Construct foundation 103 Landscaping Outside 201 Frame House 202 Finish Roof 204 4 200 102 201 NAan 203 201 204 202 203 Install Siding Install Soffit and Fascia Inside Electrical Plumbing Mechanical 300 2 301 302 303 402 401, 302 400 401 Drywall Finish Carpentry & Fixtures Inspections Frame Electro-Mechanical Inspections Final Milestone#1 Milestone#2 201 301 402 403 404 1 303, 402 204 0 405 403 OStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts