9.17 Determine the largest capacity medium-duty dragline bucket that can be used on a dragline equipped...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
9.17 Determine the largest capacity medium-duty dragline bucket that can be used on a dragline equipped with 80 ft of boom when the boom is operating at an angle of 35 degrees. The excavated earth weights 98 lb/cf loose measure. For problem 9.17, please follow below steps: 1. Use table 9.12 to find safe capacity of dragline 2. Go to table 9.16 and follow below steps: a. Pick one size b. Consider its struck capacity c. Check its weight of bucket d. Calculate the weight of material which is material unit weight * struck capacity e. Check to see if total weight is less than safe weight 3. Redo step 2 to find the largest size of bucket 2222222 TABLE 9.17 Representative performance specifications for clamshell rigged crane Speeds Travel Swing Rated single-line speed Lift clamshell Dragline Magnet Third drum (standard travel) Third drum (independent travel) Rated line pulls (with standard engine) Lift clamshell Dragline Magnet Third drum 0.9 mph maximum 3 rpm maximum 166 fpm 157 fpm 200 fpm 185 fpm 127 fpm 29,600 lb SLP 31,400 lb SLP 24,800 lb SLP 25,500 lb SLP alors Performance figures are based on machine equipped with standard engine. SLP stands for Single Line Pull or 1-part line. 288 Construction Planning, Equipment, and Methods TABLE 9.12 Typical working ranges for cranes with maximum counterweights and rigged for dragline work J, boom length 50 ft Capacity (lb)* K, boom angle (degrees) A, dumping radius (ft) B, dumping height (ft) C, max. digging depth (ft) J, boom length 60 ft: Capacity (lb)* K, boom angle (degrees), A, dumping radius (ft) B, dumping height (ft) C, max. digging depth (ft) J, boom length 70 ft Capacity (lb)* K, boom angle (degrees) A, dumping radius (ft) B, dumping height (ft) C, max. digging depth (ft) J, boom length 80 ft Capacity (lb)* K, boom angle (degrees) A, dumping radius (ft) 12,000 12,000 20 25 55 50 10 14 40 36 ខ្លួនខគ - ខ្លួននគទ 6,000 20 86 22 11,000 25 60 18 36 8,500 25 73 23 36 6,700 12,000 12,000 30 50 18 32 B, dumping height (ft) C, max. digging depth (ft) D, digging reach *Combined weight of bucket and material must not exceed capacity. 11,800 30 55 22 32 9,200 30 70 28 32 7,200 30 79 33 32 35 45 22 28 12,000 35 55 26 28 12,000 44220 45 12,000. 40 52 31 24 11,000 40 60 37 24 8,600 40 70 42 24 25 81 27 40 36 Depends on working conditions and operator's skill with bucket 12,000 84478 45 9,800 45 65 47 20 40 27 20 12,000 45 50 35 20 11,800 45 55 42 20 TABLE 9.16 Representative capacities, weights, and dimensions of dragline buckets Dimensions (in.) Struck Size capacity (cy) (cf) w NAWNA 2/1/ 23/ 11 17 24 32 39 47 53 60 67 74 82 90 Weight of bucket (lb) Heavy duty Light Medium duty duty 760 880 1,275 1,460 1,640 1,850 2,220 2,945 2,410 3,300 3,010 3,750 3,375 4,030 3,925 4,825 4,100 5,350 4,310 5,675 4,950 6,225 5,560 6,660 2,100 2,875 3,700 4,260 4,525 4,800 5,400 6,250 6,540 7,390 7,920 Length 35 40 45 48 49 53 54 54 56 61 63 65 Width Height 20 23 25 27 31 32 36 38 39 40 41 43 8888 £ £ £ £ £ 80 28 36 41 45 45 48 48 51 53 53 55 55 9.17 Determine the largest capacity medium-duty dragline bucket that can be used on a dragline equipped with 80 ft of boom when the boom is operating at an angle of 35 degrees. The excavated earth weights 98 lb/cf loose measure. For problem 9.17, please follow below steps: 1. Use table 9.12 to find safe capacity of dragline 2. Go to table 9.16 and follow below steps: a. Pick one size b. Consider its struck capacity c. Check its weight of bucket d. Calculate the weight of material which is material unit weight * struck capacity e. Check to see if total weight is less than safe weight 3. Redo step 2 to find the largest size of bucket 2222222 TABLE 9.17 Representative performance specifications for clamshell rigged crane Speeds Travel Swing Rated single-line speed Lift clamshell Dragline Magnet Third drum (standard travel) Third drum (independent travel) Rated line pulls (with standard engine) Lift clamshell Dragline Magnet Third drum 0.9 mph maximum 3 rpm maximum 166 fpm 157 fpm 200 fpm 185 fpm 127 fpm 29,600 lb SLP 31,400 lb SLP 24,800 lb SLP 25,500 lb SLP alors Performance figures are based on machine equipped with standard engine. SLP stands for Single Line Pull or 1-part line. 288 Construction Planning, Equipment, and Methods TABLE 9.12 Typical working ranges for cranes with maximum counterweights and rigged for dragline work J, boom length 50 ft Capacity (lb)* K, boom angle (degrees) A, dumping radius (ft) B, dumping height (ft) C, max. digging depth (ft) J, boom length 60 ft: Capacity (lb)* K, boom angle (degrees), A, dumping radius (ft) B, dumping height (ft) C, max. digging depth (ft) J, boom length 70 ft Capacity (lb)* K, boom angle (degrees) A, dumping radius (ft) B, dumping height (ft) C, max. digging depth (ft) J, boom length 80 ft Capacity (lb)* K, boom angle (degrees) A, dumping radius (ft) 12,000 12,000 20 25 55 50 10 14 40 36 ខ្លួនខគ - ខ្លួននគទ 6,000 20 86 22 11,000 25 60 18 36 8,500 25 73 23 36 6,700 12,000 12,000 30 50 18 32 B, dumping height (ft) C, max. digging depth (ft) D, digging reach *Combined weight of bucket and material must not exceed capacity. 11,800 30 55 22 32 9,200 30 70 28 32 7,200 30 79 33 32 35 45 22 28 12,000 35 55 26 28 12,000 44220 45 12,000. 40 52 31 24 11,000 40 60 37 24 8,600 40 70 42 24 25 81 27 40 36 Depends on working conditions and operator's skill with bucket 12,000 84478 45 9,800 45 65 47 20 40 27 20 12,000 45 50 35 20 11,800 45 55 42 20 TABLE 9.16 Representative capacities, weights, and dimensions of dragline buckets Dimensions (in.) Struck Size capacity (cy) (cf) w NAWNA 2/1/ 23/ 11 17 24 32 39 47 53 60 67 74 82 90 Weight of bucket (lb) Heavy duty Light Medium duty duty 760 880 1,275 1,460 1,640 1,850 2,220 2,945 2,410 3,300 3,010 3,750 3,375 4,030 3,925 4,825 4,100 5,350 4,310 5,675 4,950 6,225 5,560 6,660 2,100 2,875 3,700 4,260 4,525 4,800 5,400 6,250 6,540 7,390 7,920 Length 35 40 45 48 49 53 54 54 56 61 63 65 Width Height 20 23 25 27 31 32 36 38 39 40 41 43 8888 £ £ £ £ £ 80 28 36 41 45 45 48 48 51 53 53 55 55
Expert Answer:
Related Book For
Essentials Of Statistics For Business And Economics
ISBN: 9781305081598
7th Edition
Authors: David Anderson, Thomas Williams, Dennis Sweeney, Jeffrey Cam
Posted Date:
Students also viewed these civil engineering questions
-
Calculate the maximum time increment that can be used for node 5 in Figure P4-80 for a transient numerical analysis. Also write the nodal equation for this node. Figure P4-80 2 cm 1 cm T. 55C gypsum...
-
Determine an equivalent T-section that can be used to replace the transformer in Fig. 13.88. j25 40
-
The IA64 processors contain registers that can be used to address a 64-bit address space. However, Windows XPlimits the address space of user programs to 8-TB, which corresponds to 43 bits' worth....
-
A firm has four service centers, S1, S2, S3, and S4, which provide services to each other, as well as to three operating divisions, A, B, and C. The distribution of each service centers output as...
-
A recent study compared the time spent together by single- and dual-earner couples. Ac-cording to the records kept by the wives during the study, the mean amount of time spent together watching...
-
Remapping of bad blocks by sector sparing or sector slipping could influence performance. Suppose that the drive in Exercise 14.17 has a total of 100 bad sectors at random locations and that each bad...
-
Unless otherwise specified, which rule will always be processed?
-
American Products is concerned about managing cash efficiently. On the average, inventories have an age of 90 days, and accounts receivable are collected in 60 days. Accounts payable are paid...
-
2. There are two kinds of people, who are those with college degrees and those without college degrees. Assume that they are all white-collar workers. The wage status is described in Table 1. Table...
-
First Trax Company manufactures snowboards. Its standard cost information follows. First Trax has the following actual results for the month of June: Number of units produced and sold...
-
9. Peak Inc. purchased 80% of the outstanding voting shares of Summit Inc. for $700,000 on July 1, 2019. On that date, Summit Inc. had Common Stock and Retained Earnings worth $210,000 and $70,000....
-
1. what data analytics is, why we need data analytics, how it develops very fast recently? 2. Providing one example of using data to make big decisions. The decision-maker can be an organization, a...
-
Complete the following questions in the space provided. 1. Potassium Nitrate decomposes on heating to produce potassium nitrite and oxygen. When 5.05g of potassium nitrate is heated: a. Write a...
-
Why is there this error in the code? Using MATLAB gn=3 sn=17 I =(gn*60)+(sn*2) A = 250/(I + 100) T = 1/(5*I) a0 =(A/2) number_of_points = 100 step_size = T/number_of_points t = 0:step_size:T f = a0...
-
2. A hydrocarbon X has a relative molecular mass of 56. Complete combustion of 0.1g of X gives 0.316g of CO2 and 0.128g of water. Find the empirical and molecular formula of X. (6 marks)
-
What is the final electron receiver in the electron-transport chain?
-
Olive Ltd. sold inventory costing $90,000 to Hub Ltd. Olive Ltd. recorded a $20,000 profit before tax on these transactions. All these transactions occurred during the financial year 2021-22. On 30...
-
A certain Christmas tree ornament is a silver sphere having a diameter of 8.50 cm. Determine an object location for which the size of the reflected image is three-fourths the size of the object. Use...
-
U.S. News & World Report publishes comprehensive information on Americas best colleges (Americas Best Colleges, 2009 ed.). Among other things, they provide a listing of their 133 best national...
-
A sales manager collected the following data on annual sales for new customer accounts and the number of years of experience for a sample of 10 salespersons. / a. Develop a scatter diagram for these...
-
A study of 31,000 hospital admissions in New York State found that 4% of the admissions led to treatment-caused injuries. One-seventh of these treatment-caused injuries resulted in death, and...
-
The required rate of return is 12%, and the expected rate of inflation over the life of the project is forecast to remain steady at 3%. Should you invest in this project?
-
For your answer to Problem 3.11, construct an argument as to why this selection process is useful for deciding which project is best. Now, construct a counterargument to criticize this choice. In...
-
Scoring Model. Suppose the information in Problem 3.13 was supplemented by importance weights for each of the four assessment criteria, where 1 = low importance and 4 = high importance: Assume, too,...
Study smarter with the SolutionInn App