Question: a . A factory is building a robot using an assembly line that consists of the following tasks with their respective durations ( in hours
a A factory is building a robot using an assembly line that consists of the following tasks with their respective
durations in hours:
Task A: hours
Task B: hours depends on Task A
Task C: hours depends on Task A
Task D: hours depends on Tasks B and C
Task E: hours depends on Task D
i Draw the project network diagram and identify the critical path
ii Calculate the total duration to complete the project.
b Consider the field of embodied Al where agents interact with their environments to perform tasks. Discuss
the following aspects:
i What is an embodied Al
ii How does embodied Al differ from traauuna Al approaches?
iii. Briefly describe some major challenges in the design of embodied Al systems. How do you propose to
solve them?
iv Briefly discuss the role of knowledge representation and planning in the design of embodied Al systems
through a simple example.
c Knowledge Representation:
i Compare between propositional logic and predicate logic as methods of knowledge representation
through a simple example.
ii Use production rules to design a simple expert system that is capable of predicting heart diseases to
assist a healthcare professional.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
