Question: A certain part is routed through 4 machines , it is made in very large quantities on a production line in which an automated work

A certain part is routed through 4 machines , it is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines . Transfer time between stations is 163 seconds per cycle . The total time required to set up the entire line is 100 hours . The operation times at the individual machines are given in the table below . (Do not round your answer ) Machine Setup time (hr.) 4 Operation time (min .) 5.01 2 2 3.5 3 8 6.0 4 4 5.5 Find the theoretical long-term production rate (parts ts/hr) for the production line.
A certain part is routed through 4 machines , it
25 points A certain part is routed through 4 machines, it is made in very large quantities on a production line in which an automated work handling samis used to transfer parts between machines Transfer time between stations 163 seconds per cycle. The total time required to set up the trees 100 hours. The operation times at the individual machines are given in the table below. (Do not round your answer) Machine 1 2 3 4 Setup time (hr) 4 2 8 4 Operation time (min.) 5.0 3.5 60 55 Find the theoretical long-term production rate (parts/hr) for the production line. Write your answer with two decimal places

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!