Question: ( a ) Consider a refrigerator control system. Identify the controlled variable, controlling variable and setpoint in the refrigerator control system and define elements of
a Consider a refrigerator control system. Identify the controlled variable, controlling variable and setpoint in the refrigerator control system and define elements of the control system in terms of the refrigerator components.
Marks
b Suppose the temperature range to is linearly represented by the standard current range of to What current will result from What temperature does represent? Marks
Q Set. A The following jobs are waiting to be processed at a drilling centre. Today is day Using the shortest processing time, longest processing time, last come first serve and critical ratio scheduling rule, in what sequence would the jobs be processed?
tableJobDate Job received,Production days needed,Job Due date
Q Set. B The following jobs are waiting to be processed at a shaping machine. Today is day Using the shortest processing time, longest processing time, last come first serve and critical ratio scheduling rule, in what sequence would the jobs be processed?
tableJobDate Job received,Production days needed,Job Due date
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
