Question: A manager wants to control a bottling process with upper and lower specification limits of 2100 cc and 1900 cc. He has noticed that the

A manager wants to control a bottling process with upper and lower specification limits of 2100 cc and 1900 cc. He has noticed that the process is not centered. If the standard deviation of the process is 40 cc, what is the maximum process mean at which the process will still be deemed capable ?