Question: A part structure, lead time ( weeks ) , and on - hand quantities for product A are shown below. Part Inventory On Hand A

A part structure, lead time(weeks), and on-hand quantities for product A are shown below.
Part
Inventory On Hand
A
0
B
4
C
9
D
4
E
5
F
4
G
2
H
10
Upper AUpper B Subscript left parenthesis 1 right parenthesisUpper C Subscript left parenthesis 1 right parenthesisUpper D Subscript left parenthesis 1 right parenthesisUpper E Subscript left parenthesis 1 right parenthesisUpper E Subscript left parenthesis 1 right parenthesisUpper C Subscript left parenthesis 1 right parenthesisUpper G Subscript left parenthesis 1 right parenthesisUpper H Subscript left parenthesis 1 right parenthesisUpper F Subscript left parenthesis 1 right parenthesisfont size decreased by 2 LT equals 1font size decreased by 2 LT equals 1font size decreased by 2 LT equals 1font size decreased by 2 LT equals 1font size decreased by 2 LT equals 3font size decreased by 2 LT equals 2font size decreased by 2 LT equals 1font size decreased by 2 LT equals 1font size decreased by 2 LT equals 1font size decreased by 2 LT equals 2
The tree diagram has 10 rectangles. Each rectangle has an LT values displayed to the right of the rectangle. A rectangle at the top center is labeled A (LT =1). Two branches originate from the rectangle A and connect the rectangle to two rectangles. The first rectangle is labeled B (1)(LT =1) and the second rectangle is labeled F (1)(LT =1). Two branches originate from rectangle B (1) and connect the rectangle to two other rectangles labeled C (1)(LT =2) and D (1)(LT =1). One branch originates from rectangle D (1) and connect the rectangle to another rectangle labeled E (1)(LT =1). Two branches originate from rectangle F (1)(LT =1) and connect the rectangle to two other rectangles labeled G (1)(LT =3) and H (1)(LT =1). Two branches originate from rectangle H (1) and connect the rectangle to two other rectangles labeled E (1)(LT =1) and C (1)(LT =2).
The field service manager, Al Trostel, has just called and told you that the requirements for B and F should each be increased by 10 units for his repair requirements in the field. Production requirement is 20 units of A in week 8.
Part 2
a) Prepare a list showing the quantity of each part needed to produce the requirements for the service manager and the production request of 10 Bs and Fs.
Part
Quantity
A
enter your response here
B
enter your response here
C
enter your response here
D
enter your response here
E
enter your response here
F
enter your response here
G
enter your response here
H
enter your response here

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!