Question: A project has an average duration of 25 weeks with a standard deviation of 4 weeks. Assume that actual project duration is normally distributed. The
A project has an average duration of 25 weeks with a standard deviation of 4 weeks. Assume that actual project duration is normally distributed.
The probability that we will need between 20 and 25 weeks to finish this project is:
Group of answer choices
0.39
0.11
0.61
0.50