Question: A small engineering project has to be completed in 75 days maximum terminal times. The activities of the project, their duration and their precedencies relations

A small engineering project has to be completed

A small engineering project has to be completed in 75 days maximum terminal times. The activities of the project, their duration and their precedencies relations are given in the following Table Activity Depends on (precedence relation) Duration (days) B C D E F G B B C C D&E F&G 20 8 15 4 20 8 22 24 12 5 K a) Draw the precedence diagram of the project b) Calculate the earliest and latest times for starting finishing and the total float of each activity considering that the starting time of the project is and the terminal time for completing the project is 75 days. C) Write down the critical path(s)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock