Question: a work study sample of a manufacturing activity conducted over a 4 0 - hour period shows that a worker with an 8 5 %

a work study sample of a manufacturing activity conducted over a 40-hour period shows that a worker with an 85% rating produced 12 parts. The workers idle time was 10% and the allowance factor was 12%. Find the Standard time for this activity.