Question: A work-study sample of a manufacturing activity conducted over a 40-hour period shows that a worker with an 85% rating produced 12 parts. The worker's

A work-study sample of a manufacturing activity conducted over a 40-hour period shows that a worker with an 85% rating produced 12 parts. The worker's idle time was 10% and the allowance factor was 12%
Find the Normal and Standard time for this activity.

Step by Step Solution

3.29 Rating (155 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Average actual time 40 hours Normal ti... View full answer