Question: Activity Time (Days) Required Predeci A 2 B 3 C 4 D 1 D T | I E 2 B F 5 B G 7

Activity Time (Days) Required Predeci A 2 B 3 C 4

Activity Time (Days) Required Predeci A 2 B 3 C 4 D 1 D T | I E 2 B F 5 B G 7 C . 2 D, E 3 F G 1 HI ask: Draw an AOA network diagram and identify the ritical path for the project