Question: An assembly line with 1 5 tasks is to be balanced. The total time required for all 1 5 tasks is 3 9 minutes. Ament
An assembly line with tasks is to be balanced. The total time required for all tasks is minutes. Ament the tasks, the longest task takes minutes, and the shortest task takes minutes. The assembly line will operale for asto minutes per day. Compute the minimum and maximum cycle times.
Insufficient information is given to compute the answers
Minimum cycle time minutes; maximum cycle time minutes
Minimum cycle time minutes; maximum cycle time minutes
Minimum cycle time minutes; maximum cycle time minutes
Minimum cycle time minutes; maximum cycle time minutes