Question: An electronics manufacturer makes remote control devices for interactive - cable - TV systems. The following assembly tasks must be performed on each device. Task
An electronics manufacturer makes remote control devices for interactivecableTV systems. The following assembly tasks must be performed on each device.
Task
Description
Predecessors
Time min
A
Place circuit into circuit frame
B
Solder circuit connections to central circuit control
A
C
Place circuit assembly in device frame
B
D
Attach circuit assembly to device frame
C
E
Place and attach display to frame
F
Place and attach keypad to frame
G
Place and attach top body of device to frame
E F
H
Place and attach battery holder to frame
D
I
Place and attach bottom body of device to frame
G H
J
Test device
I
Draw the precedence diagram for this problem, then determine the following:
a What is the sum of the task times?
minutes
b What cycle time will allow the production of units over a tenhour day?
minutes
c What is the theoretical number of workstations needed?
d What is the actual number of stations?
e Was there an opportunity to improve the balance of the line based on cycle time?
Select
If so what is the new cycle time, idle time and efficiency?
Select
f Based on your answer to e what is the total idle time over the hour work day, in minutes?
Select
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock