Question: An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device. Task / Predecessor(s) / Time

An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device. Task / Predecessor(s) / Time (min.) A / / 0.50 B / A / 0.70 C / B / 0.40 D / C / 0.30 E / / 0.30 F / / 0.20 G / E, F/ 0.35 H / D / 0.40 I / G, H / 0.60 J / I / 0.30

a. Draw the precedence diagram for this problem. b. What cycle time will allow the production of 200 units over a ten-hour day? c. What is the theoretical number of workstations needed? d. Balance this assembly line using the heuristic most following tasks. e. Determine the balancing efficiency.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!