Question: An ISE is performing job-shop scheduling using TOC. Below are the processing times for five different jobs on each machine and the routing of each

An ISE is performing job-shop scheduling using
An ISE is performing job-shop scheduling using
An ISE is performing job-shop scheduling using TOC. Below are the processing times for five different jobs on each machine and the routing of each job. JOB JOB P MATRIX Machinej 1 2 3 4 5 || Sum 13 1 15 11 13 7 13 93 9 14 11 5 7 11 2 7 1 12 5 11 14 9 2 13 47. 46 39 35 51 Z MATRIX Operation 1 2 3 4 1 4 5 3 5 3 1 4 2 3 5 4 4 1 2 5 3 2 4 1 uwn 5 2 2 1 3 5 SUM Machine 5 was assumed to be the bottleneck and the following schedule was developed. 0 16 27 40 Scheduling of the jobs on machine 5 Job Selected 2 3 1 4 5 (s.5.c.5] (0.9) 16,27 (27,40] 40,45) 45.58) 5 45 a) (5 pts) Complete the following table for Machine 1. si and di on Machine 1 14 11 12 7 11 14 47 46 5 1 9 39 7 12 2 35 11 5 13 51 2 35 41 4 1 2 5 3 3 2 4 1 5 SUM Machine 5 was assumed to be the bottleneck and the following schedule was developed. Scheduling of the jobs on machine 5 S Job Selected 16 (1.5.c.51 10.9) SA116.271 [27.40) 140,451 145.581 a) (5 pts) Complete the following table for Machine 1. ti and di on Machine 1 Job i dil b) (5 pts) Order the jobs on Machine 1 and complete the following table. Scheduling of the jobs on machine 1 Job Selected Ll.c.il An ISE is performing job-shop scheduling using TOC. Below are the processing times for five different jobs on each machine and the routing of each job. JOB JOB P MATRIX Machinej 1 2 3 4 5 || Sum 13 1 15 11 13 7 13 93 9 14 11 5 7 11 2 7 1 12 5 11 14 9 2 13 47. 46 39 35 51 Z MATRIX Operation 1 2 3 4 1 4 5 3 5 3 1 4 2 3 5 4 4 1 2 5 3 2 4 1 uwn 5 2 2 1 3 5 SUM Machine 5 was assumed to be the bottleneck and the following schedule was developed. 0 16 27 40 Scheduling of the jobs on machine 5 Job Selected 2 3 1 4 5 (s.5.c.5] (0.9) 16,27 (27,40] 40,45) 45.58) 5 45 a) (5 pts) Complete the following table for Machine 1. si and di on Machine 1 14 11 12 7 11 14 47 46 5 1 9 39 7 12 2 35 11 5 13 51 2 35 41 4 1 2 5 3 3 2 4 1 5 SUM Machine 5 was assumed to be the bottleneck and the following schedule was developed. Scheduling of the jobs on machine 5 S Job Selected 16 (1.5.c.51 10.9) SA116.271 [27.40) 140,451 145.581 a) (5 pts) Complete the following table for Machine 1. ti and di on Machine 1 Job i dil b) (5 pts) Order the jobs on Machine 1 and complete the following table. Scheduling of the jobs on machine 1 Job Selected Ll.c.il

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!