Question: Assignment ( 1 ) Consider a Mobile Device Assembly and Quality Assurance System. The system consists of several key steps: component assembly, software installation, functional

Assignment (1)
Consider a Mobile Device Assembly and Quality Assurance System. The system consists of several key steps: component assembly, software installation, functional testing, and final packaging. The assembly line processes two types of products: Smartphone A and Tablet B.
I
System Description:
Smartphone A and Tablet B arrive at the assembly line according to separate exponential distributions. Smartphone A arrives every 6 minutes, while Tablet B arrives in batches of 3 every 40 minutes. Select a different picture for each device.
A production worker is responsible for the assembly of Smartphone A with a triangular distribution with a minimum of 2 minutes, a mode of 5 minutes, and a maximum of 9 minutes. For Tablet B, the assembly takes a triangular distribution with a minimum of 6 minutes, a mode of 10 minutes, and a maximum of 15 minutes.
After assembly, both products go through software installation and this is done by a technician. Smartphone A has TRIA (2,3,4) minutes installation time, while Tablet B installation time is Weibull distributed with a scale parameter of 7 minutes and a shape parameter of 4. You must use single Process module for modeling the technician.
Functional testing follows the software installation, which is a shared process for both products. The
 Assignment (1) Consider a Mobile Device Assembly and Quality Assurance System.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!