Question: Assignment 2 - Work Breakdown Structure You are preparing to build a simple koi pond in your backyard. You'll need to design it, buy the

Assignment 2 - Work Breakdown Structure You are preparing to build a simple koi pond in your backyard. You'll need to design it, buy the materials, prepare and do the work. Consider anything else you might have to do, as well. There is no one "right" way to do this, but there are deficient ways. Create a Work Breakdown Structure (WBS) that: Uses nouns as the work packages (lowest level) - this requires some thinking! For example, if you were creating a work package for digging a hole, you would say: "Hole dug" Don't say "Dig hole." ls broken down to at least 3 levels (not every task will go to three or more levels, but some should) and remember, the project is at the top (for this assignment, the project doesn't need a level number) Is numbered (1.0, 1.1, 1.2, 1.3.) as needed Put the hours for each level right on the chart/list (estimate best you can), and roll them up to the next level, and finally give a total hours' figure at the project level. See images below for formatting. FAQS: Answered You may take liberty with what you assume the pond will look like, the size, the materials used, where you buy the materials, and how you will do the work. Keep it simple. Everyone's WBS will look different. Make your own estimates - just be reasonable. Everyone's estimates will be different. Remember to put them on the WBS. One page is fine (if it fits); otherwise go to 2 pages. You shouldn't need more. Black and white is fine (no design or colors needed). If using Excel, indenting will help with readability (see layout image below)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
