Question: Automated Guided Vehicle Systems: Example 3 There are 5 workstations ( A - E ) and a load / unload station F . The estimated

Automated Guided Vehicle Systems: Example 3
There are 5 workstations (A-E) and a load/unload station F. The estimated
time of moving the component on AGV between stations is as follows
100 components re machined every 8 hour shift, manufacturing sequence is A-
Every drop off and pick up the sing required to meet demand of moving the 100
components.
The load factor is assumed to be 0.65 and the traffic factor 0.95