Question: b ) BDA 4 0 7 0 3 A direct time study was conducted at an assembly line which has a 1 2 - hour

b)
BDA 40703
A direct time study was conducted at an assembly line which has a 12-hour operation per day. The operation is divided into five work elements: A, B, C, D and E as shown in Table Q2.2. Elements C and E were done on fully automatic machines, while other elements are manually done. Operators A and B were rated 15% lower than normal, while Operator D was 10% higher than normal. The company allocates a 16% total allowance. Analyse the data and propose an appropriate standard time (min/unit) for the overall assembly process.
(6 marks)
Table Q2.2 Direct time study data
\table[[Job Element,\table[[Average Process Time],[(minutes)]]],[A,25],[B,6.5],[D,13],[E,4]]
 b) BDA 40703 A direct time study was conducted at an

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!