Question: (b) Construct X-bar chart for the data collected on measurement of a gear shaft making unit. Assume A2 as 0.337 (5 marks) Subgroup Shift Shaft

(b) Construct X-bar chart for the data collected
(b) Construct X-bar chart for the data collected on measurement of a gear shaft making unit. Assume A2 as 0.337 (5 marks) Subgroup Shift Shaft Diameter (mm) Mean Range 1 15.3 14.4 15.3 15.0 15.3 15.9 15.6 14.0 14.0 14.8 14.9 15.5 15.1 N 16.4 15.4 15.3 15.2 15.8 3 15.0 14.8 15.3 16.0 16.2 14.9 15.3 13.6 16.4 16.5 16.5 4 16.4 15.3 15.0 15.2 15.6 18.5 15.6 16.4 14.9 14.9 15.4 16.5 15.0 15.1 15.3 5 15.0 Maximum size for new files: 5GB