Question: B F E 3 3 For the network shown in the figure above what is the project duration? O A. 14 B. 6 O C.

B F E 3 3 For the network shown in the figure

B F E 3 3 For the network shown in the figure above what is the project duration? O A. 14 B. 6 O C. 15 OD. 13