Question: B to minimize material handling between cells. Using cellular manufacturing terminology, machines 1 and 3 are called bottleneck machines since they bind two cells together.

B to minimize material handling between cells.
Using cellular manufacturing terminology, machines 1 and 3 are called "bottleneck"
machines since they bind two cells together. When bottleneck conditions exist, as discussed
previously, one can attempt to minimize the disruptive effects of having parts from other cells
intrude on neighboring cells by locating bottleneck machines at the boundary between cells.
Alternatively, the parts that require processing by the bottleneck machines could be reexam-
ined to determine if alternative processing approaches can be used. Perhaps parts can be
Figure 3.31 Machine-part matrix.
 B to minimize material handling between cells. Using cellular manufacturing terminology,

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!