Question: Based on Table B, Consider that the maximum resource hours available per week are 15, determine which weeks are overcommitted. Question 1 Consider the following


Based on Table B, Consider that the maximum resource hours available per week are 15, determine which weeks are overcommitted.
Question 1 Consider the following project information: Table A. Activity Predecessor Total Float Duration in Weeks Resource Hours Needed/Week Total Resources Required A 3 6 18 B 5 A 2 4 20 7 A 4 28 D 3 3 B, C 6 18 E 5 B 4 2 10 F 4 D 4 16 2 5 3 6 H 5 E, F, G 6 30 Total 146 Table B. Activity Duration ES EF LS LF Float A 3 0 5 0 5 B 5 5 12 5 12 7 12 21 12 21 D 3 12 17 16 21 E 5 21 28 21 28 F 4 17 23 22 28 G 2 21 25 24 28 H 5 28 35 28 35 Question 1 Consider the following project information: Table A. Activity Predecessor Total Float Duration in Weeks Resource Hours Needed/Week Total Resources Required A 3 6 18 B 5 A 2 4 20 7 A 4 28 D 3 3 B, C 6 18 E 5 B 4 2 10 F 4 D 4 16 2 5 3 6 H 5 E, F, G 6 30 Total 146 Table B. Activity Duration ES EF LS LF Float A 3 0 5 0 5 B 5 5 12 5 12 7 12 21 12 21 D 3 12 17 16 21 E 5 21 28 21 28 F 4 17 23 22 28 G 2 21 25 24 28 H 5 28 35 28 35Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts