Question: Based on the network below, create a loading schedule. You can shade the squares or write in them. Whatever you like. Each activity has a

 Based on the network below, create a loading schedule. You can
shade the squares or write in them. Whatever you like. Each activity

Based on the network below, create a loading schedule. You can shade the squares or write in them. Whatever you like. Each activity has a certain number of resources required. EE = Electrical Engineer and ME = Mechanical Engineer Res 1 2 3 4 5 6 7 8 9 10 11 12 EE ME The duration for each activity is located in the middle bottom square. 13 EE ME 2 3 2 3 EE 3 3 ME 3 7 7 ME 2 EE 2 5