Manufacturing cost data for Banta Company are presented below. Option A Option B 85,500 (a)...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Manufacturing cost data for Banta Company are presented below. Option A Option B €85,500 € (a) € 47,000 €46,000 € 46,500 €175,575 (b) €197,075 Direct materials used Direct labor Manufacturing overhead Total manufacturing costs Work in process 1/1/20 Total cost of work in process Work in Process 12/31/20 Cost of goods manufactured . . (c) €162,844 . €45,500 (d) € 21,500 (e) €35,231 (f) Required: (60%) (40%) a) Compute the missing amounts for each letter (a) through (i). b) Banta Company must choose between options A, B and C. Evaluate the three options and determine which one is in the best interest of Banta Company. Explain your reasoning. The options differ as follows: Option A uses moderately priced materials from a supplier that usually has the quantities needed by Banta. Option B uses high quality materials that are readily available from a local supplier. Labor and manufacturing costs can be reduced slightly since fewer items fail quality tests during production. Option C uses slight significantly less expensive materials from a local supplier. These lower quality materials result in higher labor and manufacturing overhead costs. Option C €78,050 (9) €47.750 €178.375 (h) €199,875 €35,751 01 Manufacturing cost data for Banta Company are presented below. Option A Option B €85,500 € (a) € 47,000 €46,000 € 46,500 €175,575 (b) €197,075 Direct materials used Direct labor Manufacturing overhead Total manufacturing costs Work in process 1/1/20 Total cost of work in process Work in Process 12/31/20 Cost of goods manufactured . . (c) €162,844 . €45,500 (d) € 21,500 (e) €35,231 (f) Required: (60%) (40%) a) Compute the missing amounts for each letter (a) through (i). b) Banta Company must choose between options A, B and C. Evaluate the three options and determine which one is in the best interest of Banta Company. Explain your reasoning. The options differ as follows: Option A uses moderately priced materials from a supplier that usually has the quantities needed by Banta. Option B uses high quality materials that are readily available from a local supplier. Labor and manufacturing costs can be reduced slightly since fewer items fail quality tests during production. Option C uses slight significantly less expensive materials from a local supplier. These lower quality materials result in higher labor and manufacturing overhead costs. Option C €78,050 (9) €47.750 €178.375 (h) €199,875 €35,751 01
Expert Answer:
Answer rating: 100% (QA)
Answer to a Option A Option B Option C Direct material used... View the full answer
Related Book For
Financial Markets and Institutions
ISBN: 978-0077861667
6th edition
Authors: Anthony Saunders , Marcia Cornett
Posted Date:
Students also viewed these accounting questions
-
Calculate the following ratios for Lake of Egypt Marina Inc. as of year-end 2016. Using these ratios for Lake of Egypt Marina, Inc., and the industry, what can you conclude about Lake of Egypt...
-
Calculate the following ratios for a company (year 2020): 1. Quarterly Revenue Growth; 2. Quarterly Earnings Growth, 3. Profit Margin 4. Debts/Assets Ratio, 5. Return on Equity (ROE) 6. Earnings per...
-
Calculate the following ratios for Lake of Egypt Marina, Inc. as of year-end2015. Lake of Egypt Marina, Inc Balance Sheet as of December 31,2015 and 2014 in millions of dollars Assets 2015 2014...
-
ABC Company produces and sells I product. Once the products are produced, they are sold, and there is no work-in- process, no any inventory in stock. Company uses standard costing method in its...
-
What can any retailer learn from this case?
-
A projectile is fired at an upward angle of 45.0o from the top of a 265-m cliff with a speed of 185m/s. What will be its speed when it strikes the ground below? (Use conservation of energy.)
-
Renkas Heaters selected data for October 2017 are presented here (in millions): Calculate the following costs: 1. Direct materials inventory 10/31/2017 2. Fixed manufacturing overhead costs for...
-
You have been assigned to the first audit of the Chicago Company for the year ending March 31, 2011. Accounts receivable were confirmed on December 31, 2010, and at that date the receivables...
-
Find the missing side lengths (in kilometers). (The sketches are not to scale.) 33 km 24 km 48 89 x 15 km 48% 89 22 km X = y = km E E km
-
On December 1, a six-month liability insurance policy was purchased for $900. Analyze the required adjustment as of December 31 using T accounts, and then formally enter this adjustment in the...
-
Last month, Gervais met with an insurance agent and applied for a term insurance to cover his mortgage liability. One month of premium has been collected with the temporary insurance agreement...
-
For the real - time systems in Exercise 1.2, what are reasonable response times for all those events? Data from Exercises 1.2 Discuss whether the following are hard, firm, or soft real - time...
-
A control system is measuring its feedback quantity at the rate of 100 s. Based on the measurement, a control command is computed by a heuristic algorithm that uses complex decision making. The new...
-
Why are the negative externalities associated the newly opened Barclays Centre in Brooklyn likely to be greater than the negative externalities associated with the Staples Center in Los Angeles,...
-
Assume a hierarchical memory system having a joint instruction/data cache with a memory - access cost of 10 ns on a hit and 90 ns on a miss. An alternative design without hierarchical memory...
-
Write two pseudocode routines to access (read from and write to) a 20 - item ring buffer. The routines should use binary semaphores to allow more than one user to access the buffer safely.
-
Van Westendorp analysis is a data analytic technique relying on 4 survey questions that can be used to identify the optimal pricing for an offering A) True B) False
-
If |62x|>9, which of the following is a possible value of x? A. 2 B. 1 C. 0 D. 4 E. 7
-
What is the primary risk of trading in the fed funds markets? How did this risk come into play during the financial crisis of 20082009?
-
In each of the following cases, identify what risk the manager of an FI faces and whether the risk should be hedged by buying a put or a call option. a. A commercial bank plans to issue CDs in three...
-
What is the difference between firm-specific credit risk and systemic credit risk? How can an FI alleviate firm-specific credit risk?
-
Consider an unstable plant \[G(s)=\frac{s+2}{s^{3}+4 s^{2}-5 s}\] with feedback control, as shown in Figure 10.15. a. Using Routh's stability criterion, determine the range of the control gain \(K\)...
-
Consider the closed-loop control system shown in Figure 10.24. a. Using MATLAB, plot the unit-step responses of the system for the following values of \(K: 5,50\), and 500 . b. Compute the...
-
Consider a mass-damper-spring system \(G(s)=Y(s) / U(s)=1 /\left(m s^{2}+b s+k ight)\), where \(m=1 \mathrm{~kg}, b=8 \mathrm{~N} \cdot \mathrm{s} / \mathrm{m}\), and \(k=40 \mathrm{~N} /...
Study smarter with the SolutionInn App