Question: Calculate the performance, quality, availability, and OEE based on the data below: Item Shift Length Breaks Machine Downtime Equipment Failure Changeover Time Ideal Cycle Time

Calculate the performance, quality, availability, and OEE based on the data below:

Calculate the performance, quality, availability,

Item Shift Length Breaks Machine Downtime Equipment Failure Changeover Time Ideal Cycle Time Total Count Reject Count Data 8 hours (480 minutes) (2) 20 minutes, and (1) 15 minute 25 minutes 10 minutes 5 minutes 1.0 Second 13,850 118