Question: Case Study 1: Project Schedule Management - Activity definition & sequencing : For the case study project allocated to your team, prepare the list of
Case Study 1: Project Schedule Management - Activity definition & sequencing : For the case study project allocated to your team, prepare the list of activities (at least 20 activities).
1. These activities must be linked to work packages -
2. Detail the following components of the Activity Attributes, that should include:
a. Activity Id
b. WBS Id
c. Activity Name
d. Activity Definition
e. Effort Estimate
f. Predecessor Activities
g. Successor Activities
h. Schedule i. Resource Requirement
3. Draw a Network Diagramme
4. Submit your work in a Word Document



Case Study 1: Project Schedule Management - 12.5% (Group) Activity definition & sequencing--- 12.5%: . For the case study project allocated to your team, prepare the list of activities (at least 20 activities). 1. These activities must be linked to work packages - 2. Detail the following components of the Activity Attributes, that should include: a. Activity Id b. WBS Id C. Activity Name d. Activity Definition e. Effort Estimate f. Predecessor Activities g. Successor Activities h. Schedule i. Resource Requirement 3. Draw a Network Diagramme 4. Submit your work in a Word Document Format and presentation Style: Title or Cover Page: Professional Style Table of Contents Purpose of Creating Activity Definition and sequencing activities Contribution of Team Members with remarks from Team Lead Summary or Background Information: Write about the Case Study or Project in hand WBS: o created During 1133 Assignments Activity List: List all activities involved in Your Project O SAMPLE ACTIVITY List 2.1.1 Stamping Activity 23 - Uncoiling/blanking aluminum coils" Using the blanking machine, this activity consists of uncoiling the aluminum coils to be later stamped and cut them into pieces (blanks) using laser. Activity 24 - Press lines This activity consists of essentially form the panels and other Model-S aluminum pieces (14 main pieces) by pressing them into the pressing lines. Activity 25 - Ironing In this activity, the material is squeezed and reduced in thickness along a vertical wall. Activity 26 - Hemming This activity consists of hamming the Model-$ doors' edges. This process includes folding an edge over to add thickness. Activity 27 - Prepare body assembly After concluding all aluminum body's pieces, these parts must be routed to the place intended for the assembly of the aluminum structure of the vehicle ACTIVITY SEQUENCING/relationship Table 2 - Activities sequencing and logical relationships Predecessor (s) ID / Logical Lag It) Activity ID Activity Name Load () relationship In works Conduct potential customers survey START Develop sbatches 5 / Finish-to-start Develop 30 virtual model 6 / Finish-to-star Plan internal structure design 7 / Finish-to-start Plan external structure design 7 / Finish-to-start 8 / Finish to start Develop prototype 9 / Finish-to start 11 Approve design 10 / Finish to start Plan powertrain system 11/ Finkh-to-start -1 wk o Activity attributes:ACTIVITY ATTRIBUTES Project Title: Date Prepared: Activity: Description of Work: Relationship Load or Lag Guocessor Relationship Lead or Lag Number and Type of Resources Required: Skill Requirements Other Required Resources: Type of Effort: Location of Performance Imposed Dates or Other Constraints: Assumptions: o Activity Relationship Table: SAMPLE ACTIVITY ATTRIBUTES Activity ID: 5 Activity Name: Conduct potential customers survey Activity Description: This activity consists of conducting surveys with potential customers to identify their needs and preferences regarding the car's design. WBS ID: Location: Responsible: 1.1 Tesla Office / NY Resourse Name Predecessors: Successors: Leads/lags: 6 / Finish-to-start Assumptions: Constraints: Resource requirements: All the collected data are Start no earlier than 06/03/17; . 2 Marketing Analysts useful for the project; 2 Industrial Designers o Network Diagram: 6d 10d 7d gd A 9d 7d End Mart Bd
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
