Question: Consider a process with lower process control limit as 1.338 and upper process control limit as 1.342 . The lower specification limit is 1,335 and
Consider a process with lower process control limit as 1.338 and upper process control limit as 1.342 . The lower specification limit is 1,335 and the upper specitication limit is 1.345 . Utilizing the information provided, is the process is capable of meeting design specifications? No Cannot say from the informution provided Yes None of the above