Question: Consider the network described in the table below. Activity Preceding Optimistic Probable Pessimistic A 5 1 1 1 4 B 3 3 9 Ic 6

Consider the network described in the table below. Activity Preceding Optimistic Probable Pessimistic A 51114 B 339 Ic 61014 D AB 357 E B 4611 F 6813 G DE 246 H F 339 Calculate the Variance of the project 01.78 O 1.3604.1405.82 O None of the above